ReasonForInter
Purpose – The reason for planned interruption.
|
Field |
Restrictions |
aseXML |
Schema |
|---|---|---|---|
|
xsd:string enumerated list (see ReasonForInter) |
simple |
ElectricityEnumerations |
Table 89 ReasonForInter
|
Meter Exchange - Individual |
Meter Exchange – Rollout |
Meter Replacement - Family Maintenance |
Meter Test |
Meter Fault Investigation |
|---|---|---|---|---|
|
Meter Installation - Additional |
Install Controlled Load |
Remove Meter |
Move Meter |
Meter Reconfiguration |
|
Distribution Works |
Other |
|
|
|