Forecasts
About forecasts
The levels of available forecast information are:
- Intermittent Generator A person who owns, operates or controls a generating unit forecast representing a forecast of a single Unit A Scheduled, Semi-Scheduled, or Non-Scheduled Generating Unit, which is owned by a participant and identified by a Participant ID Registered participant identifier; A company can have more than one Participant ID..
- Regional See Relevant Rules or Procedures forecast representing the sum of all wind forecasts for semi-scheduled and significant non-scheduled generating units.
Only regions with intermittent generating units have data available.
Visibility of forecasts is limited, for example:
- Only owners, their participant users, and their Transmission Network Service Provider See Relevant Rules or Procedures (TNSP Transmission Network Service Provider. A party that owns, controls or operates a transmission system.) can see all forecast periods for a single Unit.
- TNSPs can see forecasts for all Units See Relevant Rules or Procedures in their respective regions.
- The regional forecasts are available in real-time to all participants.
- The individual Unit actual MWs for a given trading day are made available the following trading day (such as after 4.00 am next day).
The types of forecasts are:
- Dispatch See National Electricity Rules (DS Dispatch)
- 5-minute predispatch(5MPD 5-minute Pre-dispatch)
- Predispatch(PD Pre-dispatch)
- Short-term Projected Assessment of System System refers to all the Web-based and File-based User Interfaces, Backend Services, APIs, Databases. Adequacy (STPASA Projected Assessment of System Adequacy. except executable files e.g., .DLLs, .LIBs and .EXEs with the user mentioned. See National Energy Rules)
The DS and 5MPD forecast is at the medium reliability level (probability of exceedence - POE Probability of Exceedance. A generalised approach to defining the probability of exceedance of electricity demand forecasts. It means the likelihood of a forecast being met or exceeded, and is expressed as a percentage (10%, 50% or 90%), or as a 1-in-2, 1-in-10, or 1-in-20 years probability. - of 50%). For other forecast types, the forecast information is at 3 different reliability levels, being low, medium and high POE (90%, 50%, and 10% respectively).
Notes:
- Dispatch forecast views only shows the source of dispatch used in dispatch. This can include the following dispatch forecast model sources:
‘PARTICIPANT’ = Participant self-forecast
‘AWEFS’ = AWEFS forecast
‘ASEFS’ = ASEFS forecast
‘FCST’ = Start-up dispatch forecast
‘SCADA’ = Persistence forecast (initialMW)
‘LAST_TARGET’ = Dispatch target from the previous dispatch interval
-
The source of dispatch forecast used in dispatch depends on the implementation status of the relevant forecast model. See the Operational Forecasting and Dispatch Handbook for wind and solar generators documentation for further information.
-
Dispatch and 5-minute pre-dispatch forecasts are only available to view for semi-scheduled units (not non- scheduled units). 5-minute Pre-dispatch forecasts are available to view following the implementation of the AWEFS/ASEFS dispatch forecast model.
-
Availability data submitted into the pre-production environment is not reflected in the pre-production forecasts. Instead, the availability data from the production environment is used in the creation of the pre-production forecasts, for the convenience of participants. To confirm successful end-to-end loading of availability data in the pre-production environment, please subscribe to the following Data Interchange files: AVAIL_SUBMISS_DAY, AVAIL_SUBMISS_CLUSTER.