Bidding Validation Messages

The following validation messages are examples only and may differ from the ones you see in:

  1. API responses
  2. The Markets Portal interface
  3. In the ack/cpt for FTP Bid submissions

 

Status

Error Code

Error Title

Error Detail

More information

NEW

NEM-BIDDING-VALIDATION-DAILYENERGYCONSTRAINTERROR

Invalid DailyEnergyConstraint

Daily energy constraint must be null or an integer not less than 0 and less than 24 X DUID Dispatchable Unit Identifier MAXCAPACITY.

 

NEW

NEM-BIDDING-VALIDATION-INVALIDRECALLPERIOD

Recall Period Violation

Recall Period applies only for ENERGY and MNSP Bids. Recall Period must be an integer or a decimal number with no more than two decimal places, between 0 and {MaxRecallPeriod} in periodid {PeriodID}.

MaxRecallPeriod is 24000.

 

NEW

NEM-BIDDING-VALIDATION-BANDAVAILEXCEEDSLOADMAXCAPACITY

Band Availability exceeds Max Load capacity

Band Availability must be <= Registered Maximum Load Capacity {1}

Your Bid is rejected because the BDU Energy Bid Direction is LOAD for the associated Energy Periods and the Band Availability (1 to 10) is greater than the Registered Maximum Load Capacity. The Band Availability must be less than or equal to the Registered Maximum Load Capacity for the DUID. Or the BDU Energy Bid MLF-adjusted Price Bands must monotonically increase from LOAD Band Availability (1 to 10) to GEN Band Availability (1 to 10). They must increase from lowest to highest

NEW

NEM-BIDDING-VALIDATION-FIXEDLOADPROVIDEDFORGENANDLOADISNOTALLOWED

Fixed Load violation

Fixed Load cannot be provided for GEN and LOAD DUID {0}

Your Bid is rejected because the optional Fixed Load value for the Energy Periods is for both directions: LOAD and GEN. For a BDU, if you provide the value, it is only allowed for a LOAD or GEN direction at a time

NEW

NEM-BIDDING-VALIDATION-PRICESNOTINCREASEDMONOTONICALLYISNOTALLOWED

Monotonically Increased Prices violation

Prices must increased monotanically for DUID {0}

Your Bid is rejected because your BDU Energy Bid for a Trading Day must include the Direction: LOAD or GEN. You must separate the Energy Bid and associated Energy Periods for the Load and Generation side of the BDU. Or the MLF-adjusted Price Bands do not monitonically increase for LOAD (1 to 10) and GEN Band Availability (1 to 10). They must increase from lowest to highest.
For details, see Bid Convexity and Monotonically Increasing Validation

NEW

NEM-BIDDING-VALIDATION-UNITREGISTEREDASSEMI-SCHEDULEDCANNOTHAVEFASTSTARTPROFILE

FastStartProfile unit requirement violation

Unit registered as Semi-Scheduled cannot have FaststartProfile in the Bid for DUID {0}

Your Bid is rejected because the Fast Start Profile associated with the Energy Bid  has a value. A Fast Start Profile is not required for a Semi-Scheduled Generating Unit

NEW

NEM-BIDDING-VALIDATION-NOFSFORBDU

Invalid Faststart details

Unit registered as BDU cannot have FaststartProfile in the bid for DUID {0} 

Your Bid is rejected because the Fast Start Profile associated with the Energy Bid  has a value. A Fast Start Profile is not required for a Bidirectional Unit

NEW

NEM-BIDDING-VALIDATION-MINIMUMMAXIMUMPRICEBANDVIOLATION

Minimum/Maximum Price Band Violation

Prices bands must be with in Market Floor Price {0}, Market Price Cap {1}, for DUID {2}

Your Bid is rejected because the Prices Bands must be within the Market Floor Price and Market Price Cap for the DUID

NEW

NEM-BIDDING-VALIDATION-ERRORINVALIDDIRECTIONFORUNIT

Invalid Direction

The Direction for DUID {1} is not matching the registration details in {0} the Bid

Your Bid is rejected because the conditional Direction value: GEN, LOAD, or BIDIRECTIONAL, associated with the Energy Bid, does not match the allowable combination for the DUID or Bid type, or both

NEW

NEM-BIDDING-VALIDATION-ERROR-MISSING-{0}-Bid

Missing {0} Direction in the Bid

Missing {0} Direction in the {1} Bid for DUID {2}

Your Bid is rejected because you did not enter a Direction value. You must enter a value for BDU Energy and Regulation FCAS Bids with one of the following values: GEN, LOAD, or BIDIRECTIONAL. A Direction value is optional for all other DUID types

NEW

NEM-BIDDING-VALIDATION-ERROR-MISSING-Bid

Missing Bid

BDU submission must have both LOAD and GEN Bids for DUID {0}

Your Bid is rejected bacause you did not enter Direction values for both sides. For a Bidirectional Unit (BDU), the Direction value associated with the Energy Bid or Energy Period determines if it is LOAD or GEN. For BDU Energy and Regulation FCAS bids, you must provide a value for both directions, and that value must be different for both sides. A Direction value is optional for all other DUID types and BDU contingency FCAS

NEW

NEM-BIDDING-VALIDATION-INVALIDUNITDISPATCHTYPE

Invalid unit disptach type

Unit {0} is not registered as a BDU

Your Bid is rejected because energy or FCAS bid parameters are only allowable for a BDU and the DUID is not registered as a BDU

NEW

NEM-BIDDING-VALIDATION-CANNOTPROVIDEENERGYLIMITFORNONBDU

Energy limit violation

Unit {0} is not registered as a BDU and cannot provide Energy limit.

Your Bid is rejected because you did not enter a value for the Energy Limit for a non-BDU DUID associated with the Energy Bid or Energy Period. The Energy Limit value is optional for BDU DUID Energy Bids

For more information, see Energy Limit Validation

NEW

NEM-BIDDING-VALIDATION-ENERGYLIMITCRITERIAVIOLATIONFORBDU

Energy limit violation

BDU {0} is violating Energy Limit criteria for direction {1}, in periodId {2}

Your Bid is rejected because the BDU value violates the Energy Limit for the Direction in Period ID {2}
For more information, see Energy Limit in BDU bids.

NEW

NEM-BIDDING-VALIDATION-CONVEXITYCRITERIAVIOLATIONFORBDU

Convexity violation

BDU {0} is violating Convexity criteria in Load band avail[{1}] and Gen band avail[{2}], in periodId {3}

Your Bid is rejected is because the BDU Energy Bid MLF-adjusted prices for effective Bid bands do not increase monotonically from LOAD bandAvail1 to bandAvail10 to GEN bandAvail1 to bandAvail10.
Effective bid bands refer to energy bid band (bandAvail) with non-zero MW capacity limited by bid MaxAvail

NEW

NEM-BIDDING-VALIDATION-NODAILYENERGYCONSTRAINTFORBDU

Invalid DailyEnergyConstraint details

Daily energy constraint must not be provided for BDUs in the bid for DUID {0}

Your Bid is rejected because you have provided the DailyEnergyConstraint field for BDU. This field is only required for energyBids

EXISTING

NEM-BIDDING-VALIDATION-INVALID-UNIT-ID

Invalid unit ID

UnitId {0} is invalid .

 

EXISTING

NEM-BIDDING-VALIDATION-INVALIDNUMBEROFSUBMISSIONFORDUID

Invalid number of Submission

Invalid number of Submission for Duid:{0}, Trading Date:{1}

 

NEW

NEM-BIDDING-VALIDATION-STANDARDTRAPEZIUMSIZEVIOLATION

Standard trapezium size violation

Standard trapezium size violation in periodid {0}, for DUID {1}

Your Bid is rejected because the following conditions are not met:
EnablementMin <= LowBreakPoint.
LowBreakPoint <= HighBreakPoint.
HighBreakPoint <= EnablementMax.

NEW

NEM-BIDDING-VALIDATION-CHECKLIMITITEMISPOSTIVE

Value is Positive

{0} cannot be positive in periodId {1}

Your Bid is rejected because the Direction value associated with the Energy Bid is LOAD and the FCAS Periods with: Enablement Min, Enablement Max, Low BreakPoint, or High BreakPoint have positive values. The values must be negative or 0. 

NEW

NEM-BIDDING-VALIDATION-CHECKLIMITITEMISNEGATIVE

Value is Negative

{0} cannot be negative in periodId {1}

Your Bid is rejected because the Direction value associated with the Energy Bid is Gen and the Energy Bids with: Enablement Min, Enablement Max, Low BreakPoint, or HighBreakPoint has negative values. The values must be positive or 0. 

NEW

NEM-BIDDING-VALIDATION-INVALIDFCASSERVICEBDU

Invalid FCAS service

{0} Duid cannot have invalid fcas service {1}

Your Bid is rejected because the DUID is not registered to provide FCAS service. Please check the DUID's registration details.

NEW

NEM-BIDDING-VALIDATION-SUMOFMAXAVAILEXCEEDSMAXCAPACITY

Sum of max avail exceeds max capacity

Sum of max avail from GEN and LOAD must be <= unit {0} max capacity {1}

Your Bid is rejected because the BDU Energy or FCAS Bid summed values with Max Availability for the LOAD and GEN Direction is greater than the DUID's Registered Maximum Capacity.  Sum of Band Availabilities must be less than or equal to the Registered Maximum Capacity of the DUID for the direction.

NEW

NEM-BIDDING-VALIDATION-NONIDENTICALREBIDEXPLAINATIONSFORGENANDLOADINBDUOFFER

Non identical rebid values

Rebid values not identical for Direction LOAD and GEN, unit {0}

You BDU Energy or FCAS Bid is rejected because the 5 field values  associated with rebidExplanation array for LOAD and GEN (direction) are not indentical.
The validations accepts only a single rebidExplanation for LOAD and GEN fields. 

NEW

NEM-BIDDING-VALIDATION-BDUFCASREGBANDAVAILSUMEXCEEDSMAXCAPACITY

BDU FCAS Regulation Band Availability violation

Sum of Band Availabilities of GEN and LOAD must be >= Maximum Capacity {0} for the direction GEN and LOAD.

Your Bid is rejected because the sum of the BDU Regulation FCAS Availabilities for Band Availabilty (1 to 10) for the FCAS Periods for both the LOAD and GEN Direction is greater than the Registered Maximum Capacity of the DUID.

NEW

NEM-BIDDING-VALIDATION-BDUFCASREGNETTRAPEZIUMGAPVIOLATION

Net Trapezium Gap Violation

Both GEN and LOAD trapeziums should not have any gaps in them i.e. GEN enablementMin=0 and LOAD enablementMax=0, for DUID {0} in periodid {1}

Your Bid is rejected because there is a gap in the combined GEN and LOAD trapezium. When both sides have availability, the individual trapeziums should meet at 0 MW

NEW

NEM-BIDDING-VALIDATION-BDUFCASREGNETTRAPEZIUMUPPERANGLEVIOLATION

Net Trapezium Upper Angle Violation

Both GEN and LOAD trapeziums should have the same upper angles, instead of GEN upper angle {2} and LOAD upper angle {3}, for DUID {0} in periodid {1}

Your Bid is rejected because the GEN and LOAD trapezium must have the same upper angle.

NEW

NEM-BIDDING-VALIDATION-BDUFCASREGNETTRAPEZIUMLOWERANGLEVIOLATION

Net Trapezium Lower Angle Violation

Both GEN and LOAD trapeziums should have the same lower angles, instead of GEN lower angle {2} and LOAD lower angle {3}, for DUID {0} in periodid {1}

Your Bid is rejected because the GEN and LOAD trapezium must have the same lower angle

NEW

NEM-BIDDING-VALIDATION-BDUFCASREGNETTRAPEZIUMUPPERANGLELESSTHANNINETYVIOLATION

Net Trapezium Upper Angle Less Than 90° Violation

When upper angle {4} is less than 90°, bid high {3} and low {2} breakpoints on the generation trapezium must be zero, for DUID {0} in periodid {1}

Your Bid is rejected because both Low Breakpoint and High Breakpoint for GEN must be 0 when upper angle is less than 90°

NEW

NEM-BIDDING-VALIDATION-BDUFCASREGNETTRAPEZIUMLOWERANGLELESSTHANNINETYVIOLATION

Net Trapezium Lower Angle Less Than 90° Violation

When lower angle {4} is less than 90°, bid high {3} and low {2} breakpoints on the generation trapezium must be zero, for DUID {0} in periodid {1}

Your Bid is rejected because both Low Breakpoint and High Breakpoint for LOAD must be 0 when lower angle is less than 90°
For more information, see Net Trapezium Rule for BDU FCAS Regulation

.EXISTING

NEM-BIDDING-VALIDATION-CONFLICTINGSTARTTYPE

Conflicting Start Type

DUID {0} has conflicting registration information(start type) and an energy Bid cannot be accepted.

 

EXISTING

NEM-BIDDING-VALIDATION-CONFLICTINGDISPATCHTYPE

Registration violation

Unit {0} is not registered as a recognised dispatchable type

Check the generating unit details = registration details

EXISTING

NEM-BIDDING-VALIDATION-UNITNOTREGISTEREDFORENERGYTYPE

Registration type issue

DUID {0} is not registered for ENERGY

DUID must be registered for the energy service type

EXISTING

NEM-BIDDING-VALIDATION-DAILYENERGYCONSTRAINTERROR

Invalid DailyEnergyConstraint

Daily energy constraint must be less than  1 million MWh

 

EXISTING

NEM-BIDDING-VALIDATION-MROPSFFORNONGENUNIT

MRPriceScalingFactor Issue

MR Bid Scaling Factor found for non - generation unit

 

EXISTING

NEM-BIDDING-VALIDATION-MROPSFVALUERANGE

Invalid MR Scaling factor

MR Bid Scaling Factor must be between 0 and 9

 

EXISTING

NEM-BIDDING-VALIDATION-MROPSFDECIMALVALUES

Invalid MR Bid Scaling Factor

MR Bid Scaling Factor cannot be greater than 4 decimal places.

 

EXISTING

NEM-BIDDING-VALIDATION-MROPSFINITIALOFFERPOSTCUTOFFTIME

MR Bid Past Cut-off Time

Initial MR Bid is past the MR Bid Cut-off time.

 

EXISTING

NEM-BIDDING-VALIDATION-5MSBIDCUTOFFTRADINGDAY

Bids with trading dates before cut-off date

You cannot submit 5-min Bids before the 5MS commencement date [{0}]. Please revert to 30-min Bids.

 

EXISTING

NEM-BIDDING-VALIDATION-MROPSFOFFERPOSTCUTOFFTIME

MR Factor change post cut-off time

MR Factor cannot be changed past the MR Bid Cut-off time.

 

EXISTING

NEM-BIDDING-VALIDATION-EXPECTEDMRCAPACITYNOTMET

MR Capacity missing

Failed to find expected MR Capacity

 

EXISTING

NEM-BIDDING-VALIDATION-RAMPUPRATEEXCEEDEDMAX

Invalid Rampuprate

 Ramp Rate must be <= registered max Ramp Rate {0}

Ramp up rate <= registered maximum ramp rate

EXISTING

NEM-BIDDING-VALIDATION-RAMPUPRATERANGEERROR

Invalid Rampdownrate

Ramp Rate must be <= registered max Ramp Rate {0}

 

EXISTING MODIFIED

NEM-BIDDING-VALIDATION-RAMPUPRATELESSTHANMAXREASON

Reason missing for Ramprateup voilation

 

Reason required for Ramp Rate lower than registered minimum ramp up rate of {0}

Your Bid is rejected because the value provided is less than the registered minimum value. The validation message provides additional information comparing the minimum ramp rate and the value in the Bid

EXISTING MODIFIED

NEM-BIDDING-VALIDATION-RAMPDOWNRATELESSTHANMAXREASON

Reason missing for Rampratedown voilation

 

Reason required for Ramp Rate lower than registered minimum ramp down rate of {0}

Your Bid is rejected because the value provided is less than the registered minimum value. The validation message provides additional information comparing the minimum ramp rate and the value in the Bid

EXISTING MODIFIED

NEM-BIDDING-VALIDATION-REASONFORRAMPUPLESSTHANNERCALC

Reason missing for ramprateup violation

 

Reason required for Ramp Rate lower than registered minimum ramp up rate of {0}

Your Bid is rejected because the value provided is less than the registered minimum value. The validation message provides additional information comparing the minimum ramp rate and the value in the Bid

EXISTING MODIFIED

NEM-BIDDING-VALIDATION-REASONFORRAMPDOWNLESSTHANNERCALC

Reason missing for rampratedown violation

 

Reason required for Ramp Rate lower than registered minimum ramp down rate of {0}

Your Bid is rejected because the value provided is less than the registered minimum value. The validation message provides additional information comparing the minimum ramp rate and the value in the Bid

EXISTING

NEM-BIDDING-VALIDATION-NOFSFORSLOWSTARTUNITS

Invalid Faststart details

Faststart details must not be provided for slow start units

 

EXISTING

NEM-BIDDING-VALIDATION

Invalid Faststart details

Fast start details must be non-blank for fast start units

Check fast start details

EXISTING

NEM-BIDDING-VALIDATION-FS-MINVALUE-FASTSTARTNONBLANK

Invalid FS min load value

Fast start min. load must not be negative

 

EXISTING

NEM-BIDDING-VALIDATION-FASTSTARTT1NEGATIVE

Invalid FS T1 value

Value for T1 parameter must not be negative

Check the fast start T1 is positive or zero

EXISTING

NEM-BIDDING-VALIDATION-FASTSTARTT2NEGATIVE

Invalid FS T2 value

Value for T2 parameter must not be negative

Check the fast start T2 is positive or zero

EXISTING

NEM-BIDDING-VALIDATION-FASTSTARTT3NEGATIVE

Invalid FS T3 value

Value for T3 parameter must not be negative

Check the fast start T3 is positive or zero

EXISTING

NEM-BIDDING-VALIDATION-FASTSTARTT4NEGATIVE

Invalid FS T4 value

Value for T4 parameter must not be negative

Check the fast start T4 is positive or zero

EXISTING

NEM-BIDDING-VALIDATION-FST1ANDT2MUSTNOTEXCEED30

Invalid Fast Start details

 Fast start T1 + T2 must be <= 30 minutes

Sum of fast start T1 + T2 <= 30 minutes

EXISTING

NEM-BIDDING-VALIDATION-FST1T2T3T4MUSTNOTEXCEED60

Invalid Fast Start details

 Fast start T1 + T2 + T3 + T4 must be < 60 minutes

Sum of fast start T1 + T2 + T3 + T4 < 60 minutes

EXISTING

NEM-BIDDING-VALIDATION-FSMIINEXCEEDREGMAX

Invalid Fast Start details

Fast start minimum Load cannot exceed registered maximum capacity of unit.

Fast start minimum load is < = registered maximum capacity

EXISTING

NEM-BIDDING-VALIDATION-OFFEREDLOWBRKPTLESSTHANMAXAVAIL

Invalid Low Break point value

Offered FCAS trapezium must not be outside the registered FCAS trapezium

Check high break point or low break point value

EXISTING

NEM-BIDDING-VALIDATION-OFFEREDHIGHBRKPTLESSTHANMAXAVAIL

Invalid High Break point value

 Offered FCAS trapezium must not be outside the registered FCAS trapezium

 

EXISTING

NEM-BIDDING-VALIDATION-UNITNOTREGISTEREDFORFCASTYPE

Registration validation error

 DUID {0} is not registered for {1}

Check DUID details are consistent with registration details

EXISTING

NEM-BIDDING-VALIDATION-PRICEBANDVALEXCEEDSVOLL

Price validation error

Band prices must be less than or equal to market price cap {0}

 

EXISTING

NEM-BIDDING-VALIDATION-PRICEBANDVALLESSTHANFLOORPRICE

Price band value violation

 Price band value must be greater than or equal to market price floor ({0})

Price bands >= market floor price

EXISTING

NEM-BIDDING-VALIDATION-ERRORPOSTREBIDCUTOFFTIME

REBID-TIME-1

Cannot Process Participant Bid

Bid is after the rebid cut-off time

EXISTING

NEM-BIDDING-VALIDATION-PRICEBANDLESSTHANMINIMUMPRICE

Price violation error

 Band prices must increase monotonically

 

EXISTING

NEM-BIDDING-VALIDATION-PRICEBANDMORETHANMAXPRICE

Band price beyond cap price

Cannot correct Over Voll Rebid - Band Price 9 must monotonically decrease from artificial Effective Cap Price {0}

 

EXISTING

NEM-BIDDING-VALIDATION-REBIDREASONFORINFLEXIBILITY

Reason missing for Inflexibility

Reason required for fixed load

Provide a reason for fixed load

EXISTING

NEM-BIDDING-VALIDATION-REBIDREASONLENGTHERROR

Rebid Reason Length violation

The rebid reason must be less than or equal to {0} characters in length

 

EXISTING

NEM-BIDDING-VALIDATION-NOTLEGACYCOMPLIANT

Period differs from Base Period (not 30-minute legacy compliant)

Until 5MS active Periods must be consistent across 30-minute ranges - Base Period {1}

 

EXISTING

NEM-BIDDING-VALIDATION-BANDAVAILEXCEEDSMAXCAPACITY

Band Availability exceeds Max capacity

Band Availability must be <= Maximum Capacity {1}

Band availability is less than or equal to the maximum capacity

EXISTING

NEM-BIDDING-VALIDATION-BANDAVAILEXCEEDSLOADMAXCAPACITY

Band Availability exceeds Max Load capacity

Band Availability must be <= Registered Maximum Load Capacity {1}

 

EXISTING MODIFIED

NEM-BIDDING-VALIDATION-BANDAVAILSUMEXCEEDSMAXCAPACITY

Band Availability violation

Sum of Band Availabilities must be >= Maximum Capacity {0} for the direction {1}

Your Bid is rejected because the sum of Energy FCAS Bid Availabilities (1 to 10) is greater than the Registered Generation or Load Capacity of the DUID.  This validation is applied to all DUIDs, including BDUs and is associated with the LOAD or GEN Direction of the Bid

EXISTING

NEM-BIDDING-VALIDATION-RAMPUPANDDOWNNOTINRANGE

Ramprate violation

Rate of change up or down beyond respective registered bounds of {0} and {1}

Rate of change up or down is within respective registered bounds

EXISTING

NEM-BIDDING-VALIDATION-MRCAPACITYFORALLBIDS

MR Capacity missing

MR Capacity must be offered for all periods when a MR Factor is submitted

 

EXISTING

NEM-BIDDING-VALIDATION-MRCAPACITYSPECIFIEDFORNONGENERATINGUNIT

MR Capacity violation

MR Capacity found for non-generation unit

 

EXISTING

NEM-BIDDING-VALIDATION-MRCAPACITYMORETHANMAXAVAIL

MR Capacity violation

MR Capacity cannot be greater than MaxAvail

 

EXISTING

NEM-BIDDING-VALIDATION-MRCAPACITYMORETHANMAX

MR Capacity violation

MR Capacity cannot be greater than 999999

 

EXISTING

NEM-BIDDING-VALIDATION-MRCAPACITYMORETHAN30XROCDOWN

MR Capacity violation

MR Capacity cannot be greater than 30 x ROC-DOWN

 

EXISTING

NEM-BIDDING-VALIDATION-MRCAPACITYFIXEDLOADPERIODS

MR Capacity violation

MR Capacity cannot be offered for fixed load periods

 

EXISTING

NEM-BIDDING-VALIDATION-INITIALBIDCUTOFFTIME

Bid Cutoff time violation

Initial Bid is past the BidCutOffTime.

 

EXISTING MODIFIED

NEM-BIDDING-VALIDATION-PRICECHANGEFORREBID

Rebid Price violation

Band prices cannot be changed for a rebid direction {0}. 

Your Bid is rejected because the band prices must remain same for a rebid

EXISTING

NEM-BIDDING-VALIDATION-NOMRPSFFORANACCEPTEDOFFER

MROPSF value violation

Failed to find MR Bid Scaling Factor when an Accepted MR Bid exists

 

EXISTING

NEM-BIDDING-VALIDATION-MRCAPACITYWITHOUTMRPSF

MRCapacity violation

Found offered MR Capacity with no MR Scaling Factor

 

EXISTING

NEM-BIDDING-VALIDATION-BANDPRICEVALUENEGATIVE

Negative Band Availabilities

Band availability figures cannot be negative.

Band availabilities are positive or zero

EXISTING

NEM-BIDDING-VALIDATION-PRICEBANDEXCEEDSMAXLOSSADJPRICE

Price violation

Band prices must be less than or equal to market price cap {0}

 

EXISTING

NEM-BIDDING-VALIDATION-ERROR

Internal service Error

Unable to process the submission. Please contact AEMO for further support

Check submission and contact Support Hub, if required

EXISTING

NEM-BIDDING-VALIDATION-MRCPACITYGREATERTHANROCUPOPPOSITELINK

MR capacity violation

MR Capacity cannot be greater than 30 x ROC-UP for Opposite Link {0}

 

EXISTING

NEM-BIDDING-VALIDATION-DISPATCHABLEUNITINACTIVE

DU Invalid

DUID {0} is invalid or not active

Check the dispatchable unit details

EXISTING

NEM-BIDDING-VALIDATION-INVALIDPARTICIPANTID

Invalid Participant Id

ParticipantId cannot be null. Please provide a valid participantId

Check your Participant ID

EXISTING

NEM-BIDDING-VALIDATION-INACTIVEMNSPPARTICIPANTID

Inactive Participant Id

 PID {0} is not authorised to submit bids for interconnector {1}

 

EXISTING

NEM-BIDDING-VALIDATION-INACTIVEPARTICIPANTID

Inactive Participant Id

This participant ID is not active

The Participant ID is not active

EXISTING

NEM-BIDDING-VALIDATION-INVALIDSUBMISSIONREQUEST

Invalid Request

Invalid input request

 

EXISTING

NEM-BIDDING-VALIDATION-ERRORINVALIDUNITREGISTRATION

DUID registration issue

DUID  {0} has conflicting registration information (start type) and an energy Bid cannot be accepted.

 

EXISTING

NEM-BIDDING-VALIDATION-ERRORCHECKSUBMISSIONTIMEISBAD

Bid Processing time violation

The trading day for this bid has ended

Check the trading date

EXISTING

NEM-BIDDING-VALIDATION-ERRORNOPERIODSINBID

Period Info missing

No periods defined in bid

Bid has period IDs 1–288

EXISTING

NEM-BIDDING-VALIDATION-ERRORINCORRECTFIRSTPERIODID

Period data violation

The first trading interval in the section must be period 1, the period Id mentioned is: {0}

Check the first trading interval is period 1

EXISTING

NEM-BIDDING-VALIDATION-ERRORINCORRECTLASTPERIODID

Period data violation

The last trading interval in the section must be period 288, the period Id mentioned is: {0}

Check the last trading interval is period 288

EXISTING

NEM-BIDDING-VALIDATION-ERRORINCORRECTPERIODCOUNT

Period data violation

 Bid must contain period ID 1 to 288

Bid has period ID 1–288

EXISTING

NEM-BIDDING-VALIDATION-ERRORPERIODCOUNTLESSTHANZERO

Period data violation

Trading interval must exceed zero. Trading interval mentioned is {0}

 

EXISTING

NEM-BIDDING-VALIDATION-ERRORPERIODCOUNTMORETHAN288

Period data violation

Trading interval cannot exceed 288. Trading interval mentioned is {0}

Check the trading interval

EXISTING

NEM-BIDDING-VALIDATION-AVAILABILITYVSMAXISBAD

Max Availability violation

 Max Availability must be <= Maximum Capacity {1}

 

EXISTING

NEM-BIDDING-VALIDATION-PASAAVAILABILITYVSOFFEREDMAXISBAD

PASA Availability violation

PASA Availability must be >= Max Availability

PASA availability >= maximum availability

EXISTING

NEM-BIDDING-VALIDATION-PASAAVAILABILITYVSMAXISBAD

PASA Availability violation

PASA availability of {0} exceeds maximum capacity of {1}

PASA availability not > maximum capacity

EXISTING

NEM-BIDDING-VALIDATION-CHECKLIMITITEMISNEGATIVE

Value is Negative

{0} cannot be negative 

 

EXISTING

NEM-BIDDING-VALIDATION-FIXEDLOADAGAINSTMAXAVAILISBAD

Fixed Load violation

Fixed Load cannot exceed maximum availability for the DUID {0}

Fixed load not is < = maximum availability

EXISTING

NEM-BIDDING-VALIDATION-PRICEBANDDIFFERS

Rebid Price Change

Band Price {0} value {1} differs from last Bid value {2}

 

EXISTING

NEM-BIDDING-VALIDATION-PRICEBANDSNOTMONOTONIC

Price violation

 Band prices must increase monotonically

 

EXISTING

NEM-BIDDING-VALIDATION-PRICEBANDSLESSTHANZERO

Price violation

 Band prices must be greater than or equal to zero

 

EXISTING

NEM-BIDDING-VALIDATION-PRICEBANDSUMERROR

Price violation

Price band value must be greater than -9999.99

 

EXISTING

NEM-BIDDING-VALIDATION-PRICEBAND1LESSTHANNEGATIVEOFBAND1FORWARDFLOW

MNSP Convex rule violation

 Band prices violate MNSP convexity rule

 

EXISTING

NEM-BIDDING-VALIDATION-INACTIVEMNSPLINK

MNSP Link inactive

MNSP Link {0} invalid or not active.

Check MNSP link details

EXISTING

NEM-BIDDING-VALIDATION-INACTIVEINTERCONNECTORID

IC registration violation

 Interconnector {0} is invalid or not active

Check interconnector details

EXISTING

NEM-BIDDING-VALIDATION-ERRORMROPSFRANGE

MROPSF value violation

 MR Bid Scaling Factor must be between 0 and 9

 

EXISTING

NEM-BIDDING-VALIDATION-ERRORMROPSFINVALIDDECIMALS

MROPSF value violation

MR Bid Scaling Factor cannot be greater than 4 decimal places.

 

EXISTING

NEM-BIDDING-VALIDATION-MRCUTOFFTIME

MR Bid cutofftime violation

Initial MR Bid is past the MR Bid Cut-off time.

 

EXISTING

NEM-BIDDING-VALIDATION-NOREBIDREASON

Rebid Reason missing

 Reason required for rebid

Provide a reason for the Rebid

EXISTING

NEM-BIDDING-VALIDATION-NOREBIDEVENTTIME

Rebid Event time missing

Event time required for rebid

 

EXISTING

NEM-BIDDING-VALIDATION-ERRORMRFACTORCHAGEPOSTCUTOFFTIME

MR Factor value violation

MR Factor cannot be changed past the MR Bid Cut-off time

 

EXISTING

NEM-BIDDING-VALIDATION-MISSINGOPPOSITEMNSPLINK

MNSP bid missing

Missing MNSP bid for {0}

Opposite MNSP bid is missing

EXISTING

NEM-BIDDING-VALIDATION-ERRORPARTICIPANTFORINTERCONNECTOR

Unauthorized submission

{0} cannot submit file for link {1}

Participant ID cannot submit bids for this Interconnector

EXISTING

NEM-BIDDING-VALIDATION-INVALIDEXPORTLINKTYPE

Invalid Link Type

 The direction provided for this Link ID {0} is not correct

Check the interconnector direction

EXISTING

NEM-BIDDING-VALIDATION-INVALIDIMPORTLINKTYPE

Invalid Link Type

 The direction provided for this Link ID {0} is not correct

 

EXISTING

NEM-BIDDING-VALIDATION-ERRORNOINTERCONNECTORFORPARTICIPANT

MNSP Registration Issue

{0} cannot submit bid for link {1} as related interconnector participant cannot be found

Participant ID cannot submit bids for this Interconnector

EXISTING

NEM-BIDDING-VALIDATION-PARTICIPANTCANNOTSUBMITBIDFORANOTHER

Unauthorized submission

PID {0} is not authorised to submit bids for DUID {2} on {3} for service {4}

Participant ID can submit bids for this DUID

EXISTING

NEM-BIDDING-VALIDATION-PARTICIPANTCANNOTSUBMITBIDFORANOTHER

Unauthorized submission

PID {0} is not authorised to submit bids for interconnector {2}

 

EXISTING

NEM-BIDDING-VALIDATION-ERRORINVALIDFCASUNITREGISTRATION

Internal service error

Missing registration bid details for {0}.Please contact the helpdesk.

 

EXISTING

NEM-BIDDING-VALIDATION-IMPROPERTRADINGDATE

Trading date format violation

Improper trading date format

Trading date format is one of:

yyyy-mm-dd, for example, 2021-04-23

yyyy-mm-dd 00:00:00, for example, 2021-04-23 00:00:00

TBC

TBC To be confirmed TBC

Cannot correct MPC Rebid - price bands must increase progressively

Each price band is > previous price band

TBC TBC TBC

Daily energy constraint must be less than 1 million MWh

Daily energy constraint < 1 million MWh

TBC TBC TBC

DUID {0} has conflicting registration information (start type) and an energy Bid cannot be accepted

DUID start type is consistent with registration details

TBC TBC TBC

Fast start details must not be provided for slow start units

Fast start details because they are not permitted for slow start units

TBC TBC TBC

Fast start minimum load cannot be negative

Fast start minimum load is a positive value

TBC TBC TBC

Max Availability must be <= Maximum Capacity {0}

Maximum availability is <= maximum capacity

TBC TBC TBC

Missing registration bid details for {0}. Please contact the Support Hub

DUID details are consistent with registration details

TBC TBC TBC

PID {0} is not authorised to submit bids for interconnector {1} or {2}

Participant ID can submit bids for this Interconnector

TBC TBC TBC

Price band {0} value {1} differs from last Bid value {2}

Rebid price bands = the initial Bid

TBC TBC TBC

Price bands cannot be changed for a rebid

Rebid price bands = the initial Bid

TBC TBC TBC

Price bands must be greater than or equal to market floor price

Price bands >= market floor price

TBC TBC TBC

Price bands must be greater than or equal to zero

Price bands >= zero

TBC TBC TBC

Price bands must be less than or equal to market price cap {0}

Price bands <= market price cap

TBC TBC TBC

Price bands violate MNSP convexity rule

Check the price bands do not violate the MNSP convexity rule

TBC TBC TBC

Reason required for low Ramp Rate

Provide a reason for low ramp up or down rate

TBC TBC TBC

The rebid reason must be less than or equal to 500 characters in length

Rebid reason <= 500 characters